IBM Global Services/AMWAY |
 |
| The highlights of the modules at each of these 33 sites are as follows: - |
 |
| Designed, Installed and Tested 150 nodes, Voice and Data Network by using LUCENT structured cabling components with 3COM Switches as connectivity Devices. |
 |
| Designed installed and tested electrical network which includes:- |
 |
 |
Electrical point wiring of UPS
Installation and load Distribution of UPS
Installation of Distribution Panel
|
|
 |
Hutchison Essar Telecom Limited |
 |
| We have designed, supplied and implemented the 300 Voice + 700 Data Nodes Network at their C-48 Okhla and X-7 Ph-II office. The technology of Data network is based on AMP passive components, Voice is on Delton & Krone Components. |
 |
| Also designed & implemented cabling solution on Tyco Net connects Products for Data Center housing 47 Server Rack's at Hutch. |
 |
TATA Teleservices |
 |
| At TATA Teleservices, Mohali we have Designed, Installed and Tested a Data Network of 1000 nodes using AMP Net connect cabling components. |
 |
Tata Consultancy Services |
 |
| We have implemented on behalf of TCS a project involving Data Networking, Electrical UPS point wiring and Site preperation across 24 Locations of the Signal Centers of Indian Army. |
 |
| Also implemented Networking and Video conferencing using Cisco and Polycom products for providing solution to GRSE and DND location of Indian Navy, which is being managed by our site engineers. |
 |
BSNL NIB Project at Banglore, Pune, Mumbai and Noida |
 |
| We have successfully executed the Data Center project involving Design & implementation of UPS Systems, Power distribution, Data & voice network cabling. The Data Center houses IBM Server racks , Storage and Sun Servers which run the application for the BSNL National Internet Backbone project. |
 |
MTNL - Convergent Billing and CRM Project: |
 |
| We have executed this project on behalf of BEL for MTNL. The scope of included Installation of Power Plant, Inverters, Battery Banks etc.,Internal Cabling for entire Power Plant. Networking for all Server Rack, SAN Switch, Tape Liberary at Data Centers. Copper Cabling on CAT 6 and internal SAN Switch, Networking Rack connectivity on OFC..E1, E2 and E3 Links connectivity from Exchanges to Data Center and DR Sites Project Locations (Mumbai and Delhi): 358 sites |
 |
Jamia Milia Islamia University |
 |
| Campus Network for above spread across all departments of the University in an area of 4 Sq Km. |
 |